With World Bank funding, 97.40% of the work on the development of a total of 44.88 km of storm-water drains was completed. All the projects proposed with Infrastructure and Amenities Funds were completed in flood-prone areas; 2.19 lakh of the proposed 2.5 lakh saplings were planted
from | The Hindu https://ift.tt/CtYfnLK
No comments:
Post a Comment